[1]
Yunita Kristina Tambunan and Fachri Muhammad 2022. ANALISIS PENGARUH GROUND VIBRATION TERHADAP BANGUNAN DI SEKITAR TAMBANG PADA PELEDAKAN INTERBURDEN B-2 DI PIT WEST SITE PMSS PT. BINA SARNA SUKSES MUARA ENIM PROVINSI SUMATERA UTARA. Jurnal Sains dan Teknologi ISTP. 17, 2 (Jul. 2022), 173–179. DOI:https://doi.org/10.59637/jsti.v17i2.157.