ANALISA PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT PADA PENGUPASAN OVERBURDEN DI PT. BUKIT ASAM TBK, DESA TANJUNG ENIM, KECAMATAN LAWANG KIDUL, KABUPATEN MUARA ENIM, PROVINSI SUMATERA SELATAN

Authors

  • Yogi Aguatian Sinaga Institut Sains Dan teknologi TD Pardede
  • Wilson S Pardosi Institut Sains dan teknologi TD Pardede

Keywords:

Overburden, Target Produksi, Waktu Hambatan

Abstract

PT Bukit Asam (Persero) Pit Tambng Air Laya (TAL) had an overburden production target in February 2024 of 1,220,000 BCM, and achieved 751,420.20 BCM. Referring to the data that researchers took in the field, the production level should be 757,773.02 BCM. To increase production, researchers made improvements to the time constraints that can be avoided and obtained production of 784,761.02 BCM and have not yet reached the production target set by the company. To be able to achieve the next production target, the addition of 21 units of conveyance was carried out and production became 1,225,798.51 BCM and has reached the production target, as a result match factor of excavation equipment and conveyance changed from an average of 0.75 to an average of 1.18.

Downloads

Published

2024-10-30

Issue

Section

Articles